Track record
Candiota Coal-fired Power Plant

The project (350 MW, 1×350 MW) was built by SEPCO on an EPC basis and began operation in 2011.

Previous Article:Papalanto Gas-fired Power Plant

Next Article :Shabha Gas Turbine Station