中文版
Infrastructure Project

SHANDONG JINAN-HEZE EXPRESSWAY

DATE:2018-04-26


This project, undertaken by SEPCO, is 153.6 km in total length with the planned maximum speed of 120km/h. The expressway was designed to be bi-directional with four lanes, fully enclosed and interchanged, where the vehicle moves in each lane under direction.