SICHUAN MEISHAN PHOSPHERUS 125KT/A ELECTROLYTIC ALUMINUM PROJECT

DATE:2018-04-26


The project capacity was set to be 125kt/a electrolytic aluminum and 150kt/a anode. The project covers an area of

1,560 mu (about 104 hectare). It adopted the GY-30 (300kA) prebaked anode aluminum electrolysis cell, characterized with center point feeding, high efficiency, and large capacity, and its and high performance. The project was undertaken by SEPCO, and was completed on Oct. 17, 2003. It was awarded the Luban Prize in 2005.