中文版
Oil, Gas and Petrochemical Project

12000BPSD NAPHTHA TREATING PLANT AND OFF SITES/UTILITIES PROJECT(EPC)

DATE:2018-04-26



The project, locating at AL SAMAWAH in Iraq, has a daily treating capacity of 12,000 barrels. It consists of ISBL part and OSBL part. ISBL adopts UOP patented technology, and is designed with three core processing units: Naphtha hydro treating unit, fixed bed plat forming with LPG recovery unit, and Par-ISOM. OSBL includes 27 sub-systems covering tank farm and flare system. The project is contracted by SEPCO on EPC basis, and now is under construction.