中文版
Power Grid Project

ZAMBIA MAAMBA-MUZUMA330KV POWER TRANSMISSION AND TRANSFORMATION (EPC)

DATE:2018-04-26


This project, construction of a 48km long power transmission and transformation line, was contracted by SEPCO on EPC basis and was completed in 2015.